Sunshine Coast Process Facility Coldrooms & Extraction Project
Project Overview
Highside Air recently completed the installation of two medium-temperature coldrooms and a tailored extraction system for a food processing facility on the Sunshine Coast. This system supports a controlled environment critical for thawing and processing stock under variable temperatures.

Key Features of the Installation
Installation of two medium-temperature refrigeration units for process flexibility
Custom-designed extraction system for Extraction while cleaning and processing
Temperature variability for thawing and processing requirements
Built to comply with Australia standards
Fully supported with 24/7 breakdown and maintenance services
Challenges and Solutions
Challenge: Creating a solution that allows for controlled thawing without temperature spikes
Solution: Installation of a variable temperature refrigeration system with precision controls.
Challenge: Managing ventilation and condensation in a high-moisture processing area
Solution: Custom-designed extraction system with high-efficiency fans and duct work to ensure optimal airflow.
Project outcome
The completed project offers the client a robust and reliable processing environment, reducing downtime and increasing operational efficiency. The variable temperature system supports multiple stages of stock processing with ease.
